Cross Community Working Group on Enhancing ICANN Accountability: Difference between revisions

JP (talk | contribs)
JP (talk | contribs)
Line 215: Line 215:
The CCWG-Accountability external legal counsel informed the group that adopting a Sole Designator model could effectively be implemented while meeting the community’s requirements and having minimal impact on the corporate structure of ICANN.<ref name="ws1draft3" /></blockquote>
The CCWG-Accountability external legal counsel informed the group that adopting a Sole Designator model could effectively be implemented while meeting the community’s requirements and having minimal impact on the corporate structure of ICANN.<ref name="ws1draft3" /></blockquote>


The "sole designator" model was originally suggested by outside counsel during the team's research in spring 2015. The reference model as proposed would grant statutory powers for the "nuclear options" - removal of board members, and removal of the entire board, as well as adding the right to inspect the records of the corporation.
The "sole designator" model was originally suggested by outside counsel during the team's research in spring 2015. The reference model as proposed would grant statutory powers for the "nuclear options" - removal of board members, and removal of the entire board, as well as adding the right to inspect the records of the corporation.<ref name="ws1draft3a1" /> Then, the other community empowerment goals envisioned by the would be operationalized by the engagement, escalation, and enforcement processes described in recommendation 2:
* Approving ICANN’s Five-Year Strategic Plan
* Approving ICANN’s Five-Year Operating Plan
* Approving ICANN’s Annual Operating Plan & Budget
* Approving The Internet Assigned Numbers Authority (IANA) Functions Budget
* Approving any modifications to Standard or Fundamental Bylaws
* ICANN Board decisions relating to reviews of IANA Functions, including the triggering of Post-Transition IANA (PTI) separation<ref name="ws1draft3a2">[https://community.icann.org/download/attachments/56145016/Formatted-Annex%202-PROOFED.pdf CCWG-Accountability WS 1 Workspace - Annex 2 to the Third Draft Proposal: Engagement, Escalation, & Enforcement], November 30, 2015</ref>


==Work Stream 2==
==Work Stream 2==